The Kenton County Airport Board (“KCAB”) will receive proposals for Terminal Drive Bridge Rehabilitation. KCAB Maintenance identified issues on the surface of the bridge on Terminal Drive, which is the main entrance to the Departures Level of the Terminal at CVG. Palmer Engineering Co. performed an inspection of the surface and structural elements of the bridge and identified that the wearing surface needs to be replaced as well as patch repair throughout the bridge and a number of other necessary repairs.
Submission Deadline: July 2, 2026, 2:00 p.m. Eastern Time
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
26 038 ITB Terminal Drive Bridge Rehabilitation