The Kenton County Airport Board (“KCAB”) will receive bids for North & South ARFF Stations Mechanical, Electrical & Plumbing (MEP) Modifications & Tank Installation. Overview: This is a General Contractor solicitation to complete the final phase of the ARFF Fluorine Free Foam Transition project. The scope includes the build-back construction of new mechanical distribution systems at both the North and South ARFF Stations. The previous phase successfully removed the old distribution systems. Scope of Work: Demolition (limited block demolition at North ARFF to allow tank access) Plumbing (installation of new distribution piping and components) Electrical Work (light electrical modifications to support new system installation) Hydro-testing (of the new system to verify functionality of controls, valves, pumps, etc.) Important Notes: The contractor will not be responsible for filling the tank with the new chemical. The charging of the new system with foam will be performed by trained ARFF personnel. The previous distribution systems have been fully removed. Facility Conditions: Work will be conducted in a 24/7/365 operational facility. Permitted work hours: 7:00 AM – 4:00 PM
Submission Deadline: 12/04/2025 at 2 p.m. EST
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
25 069 ITB North South ARFF Stations Mechanical Electrical Plumbing MEP Modifications Tank Installation