The Kenton County Airport Board (“KCAB”) will receive bids for Concourse A Apron Reconstruction - Bid Package 1. Bid Package 1 is located southeast of Concourse A and includes Gates A19 and A21. In addition, portions of Taxilanes 2N, 2C, 2S, R and Taxiway S will be reconstructed. Bituminous shoulders along Taxilane R will be reconstructed as well as the existing underdrain and airfield lighting. This area was selected to allow the taxilanes to accommodate ADG V and VI aircraft and improve taxing efficiency by removing the paved island between Taxilane 2N and 2S. There are drainage issues in this area and surrounding islands so the new pavement grading will allow for better drainage. The existing pavement has reached its design life and needs to be reconstructed to limit FOD concerns and maintain safety around the apron.
Submission Deadline: 04/17/2025 at 2:00 PM Eastern
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
25 020 ITB Concourse A Apron Reconstruction Bid Package 1