The Project includes replacement and realignment of the sanitary sewer system on the north side of the airport around Loomis Road. The proposed sanitary sewer includes replacement of some segments in the same alignment as existing and some new segments in a completely new alignment resulting in abandonment of existing. The project will tie existing sanitary sewer lines into the new proposed sewer to result in a completely operational system with a consolidated alignment as shown. The project has one connection to the “Phase 1” portion of this project already under contract.
Submission Deadline: 12/12/2024 at 2:00 PM Eastern
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
24 85 Loomis Road Sanitary Sewer Replacement Relocation Phase 2