The Project includes the upgrade of the existing software, servers and panels (reference Attachment A) including two servers, 7 UL workstations, graphics, and network equipment of the fire alarm system at CVG. This upgrade will include technician labor, engineering, project management and on-going annual support. As an alternate with the device and panel upgrades, Owner is accepting proposals to provide all necessary design, engineering, software, hardware, equipment, interfaces, connectivity, testing, training, manuals, documentation, consulting services, materials, tools, labor, and support required for replacement of additional fire panels and network switches in compliance with NFPA-72.
Submission Deadline: 08/08/2024 at 2:00 PM Eastern
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
24 60RFP Fire Alarm Device Panel Upgrades